Achieving $8 cost per dry ton produced is very possible, and
being done in many installations all
over the country right now using Deskins Quick-Dry Filtration Process.
Some operations will require more and some have actually achieved
less.
70% dry material in 7 days is common especially in
drier/hotter months. Those who achieve 90% dryness in Summer encounter
only 60% to 70% dryness in the Winter or Wetter months. Even in poorer
climates, drying occurs effectively.
Here are some places to contact and
determine the effectiveness of Deskins Filtration Process:
Compared to
All Other Dewatering Technology, Deskins Quick-Dry Filtration Process has;
High
Throughput
High
Capacity - limited only by space required
Extremely
High Efficiency - average 40% to 60% dry biosolids in 7 days
Low
Capital Costs
Low
Operational Costs - including manpower and chemicals
Low
Maintenance Costs
Completely
Eliminated Odor
and
Prepares Biosolid Transition to US EPA Class A Biosolid
US
Patents: #5,683,583 / #5,611,921 / #5,660,733 / #5,725,766 / #5,770,056 / #6,051,137
“I
can do all things through Christ which strengthens me.” Phil 4:13